Tank over DSB
 
click here to download the dsb brochure pdf

M18 Dry Support Bridge (DSB)

fast & effective
With the M18 Dry Support Bridge (DSB), just eight soldiers and a single launch vehicle can have traffic rolling across a 46 metre gap in less than 90 minutes.

The M18 Dry Support Bridge load capacity of MLC 80 (T) / MLC 100 (W) at 40m and MLC 80 (T) / MLC 96 (W) at 46m, with a width of 4.3 metres, makes it far superior to the existing bridging system which it is replacing, both in performance and speed of deployment.

essential equipment
The U.S. Army has adopted the Dry Support Bridge as its new bridging system and with 58 systems on order, DSB is set to become the new world leader.

Dry Support Bridges: proven in the field
WFEL Ltd’s M18 Dry Support Bridges have repeatedly proved their value in the field, in the USA, South Korea and Operation Iraqi Freedom.

  DSB in operation in Iraq
  Korean exercise